| Q1. |
How do I
schedule a demonstration? Are they free? |
| A. |
Simply fill out the
Demonstration Request Form and submit it via the web. We
will than call you to discuss your needs and confirm
that you are qualified for a free, no obligation
demonstration.
Link:
Demonstration Request Form |
|
| Q2. |
How long will it
take to do the demonstration? |
| A. |
Typically, a
demonstration will take a total of 1 to 3 hours.
=>Set up equipment
=>Pre-demo meeting (review safety checks, desired
results, etc).
=>Demonstration (hands on blast cleaning).
=>Take down equipment.
=>Post-demo meeting (discuss results, cost benefit
analysis). |
|
| Q3. |
Do I need to
supply dry ice? |
| A. |
No, our demonstration
trucks travel with dry ice. If you decide to purchase or
rent a system, we can refer you to a dry ice distributor
in your area. |
|
| Q4. |
What will I need
to supply? |
| A. |
You will need to
supply 3 basic things in order to run the PHX-150
system.
1) Compressed air. We will need a 1 inch NPT
(pipe size) compressed air line with shutoff (must be
within 100 feet of demo site, we will supply fittings
and inlet air hose).
2) A ground level entrance may be helpful to
unload the system
3) Something dirty to clean. |
|
| Q5. |
Can we video
tape and take photos during the demonstration? |
| A. |
Yes, we encourage
this. If you do not have your own cameras, we would be
happy to supply both (please let us know in advance). |
|
| Q6. |
If the
demonstration results are good, and we would like to get
a system, what is delivery lead time? |
| A. |
Our systems can
usually be delivered to your plant within 2-3 weeks. If
your need is more urgent, please ask your sales rep to
bring new systems in addition to his demo units. |